Got phase 1 complete that includes.
Tear down and repaint
IRS install
03 Cobra front LCAs / Eibach springs
Aluminum drive line
Saleen side skirts (my spats were toast)
Pro tint
And.......wait for it.......Installed the dreaded, hated and much maligned Aero hatch... OK bubble hatch..
Tons of other little things but that's the big stuff.
I have donned my fire suit and am prepared for the hatch flaming.

20160705_111435.jpg

axle bay.jpg


20160515_201217_resized_1.jpg

20160705_111539.jpg